Pictures of Site 42 before construction
 
The discharge flowed through a ditch in the woods before construction

 

SCRA volunteers built a weirs to measure flow rates accurately

 

This abandonded strip pit provided a "free" pond, but we had to take the discharge water under Carbon Run

 

 

Return to Site 42 Page