Scarlift Site 15 passive mine drainage treatment system modifications summer 2008.

New piping installed to allow measurement of total flow rate through the system.

 

 

 

 

 

 

 

Return to Site 15 Page

Return to SCRA Projects Page

Return to SCRA Home Page