Dr. Abner Mallity needs to tap into your expertise. Here is a system,
and a simulator.
Here is what you need
to do.
Determine values for the
two gains indicated. (The gain multiplying the error, and the gain
multiplying the pitch signal.) You need the submarine to change depth
as quickly as possible. Use settling time as the criterion.